高端外围女接单平台_全国空降快餐官方客服电话_全国空降平台官方网站_全国高端品茶联系方式

The valve order for The Tabella Hydropower Station project in Pakistan has been delivered successfully
Release time: 2020/11/6

The valve order for The Tabella Hydropower Station project in Pakistan has been delivered successfully.

The project from the start to smooth delivery, Ritai valves closely cooperate with all departments, strictly control the technology, procurement, quality, production, inspection and other key links.Under the witness of the owner, all the valve products passed all the tests once and successfully passed the acceptance and appraisal.


Project Background: Tabella T4 hydropower Station is reputed as "The Three Gorges Project of Pakistan". After completion, tabella Dam will expand capacity by 1410MW on the basis of the current capacity of 3478MW.As an important livelihood project in Pakistan, The Tabella T4 hydropower Station has been highly concerned by people from all walks of life in Pakistan.



+86-21-59170106
qrCode
主站蜘蛛池模板: 巨鹿县| 呼和浩特市| 石阡县| 罗平县| 伊金霍洛旗| 商丘市| 远安县| 加查县| 封开县| 瓮安县| 漯河市| 崇信县| 平遥县| 库伦旗| 平乐县| 光泽县| 昌都县| 连南| 天津市| 桐城市| 天峨县| 沭阳县| 景东| 革吉县| 东宁县| 卢湾区| 吉隆县| 石泉县| 闻喜县| 北京市| 本溪市| 乌鲁木齐县| 嫩江县| 湖口县| 胶州市| 淮阳县| 阳西县| 石柱| 治县。| 邵武市| 西吉县|